Materials List


Bill of Materials
-----------------
First draft 5-7-13.
Tom Gibson

*'d items need more study. Specifics at the end.

Frames
------
    frames                    1   4x8x3/4 marine plywood
    deck cleats                5'  4x3/4 solid wood 
    side cleats                6'  2x2 solid triangular

Bow
---
    Bow                        3'  4x4 solid
    Chines                    10' 1x10 solid
    Stem                    5'  4x10 solid (pair of 2x10's?)
    Post                    3'  4x4 solid

Transom
-------
    planking                1   plywood 3/4, 14" x 50"
    frame                    6'  1x4 solid

Hull
----
    side planks                4   plywood 3/4
    bottom planking            6   plywood 3/4
    bow planking            1   plywood 3/4 cut to planks
                                    OR
                            3   plywood 1/4 4x5 each
    butt blocks                32' 3/4 plywood outer ply grain ACROSS, not
                            lengthwise. Cut from Frame sheets. 6" wide
    chine log                48' 1x2 solid (scarfed, station 4 to AP)
    sheer clamp                60' 1x2 solid (scarfed, FP to AP)
    skeg                    10' x 2 x 8 solid (15" x 10' triangle)
    keel                    12' x 2 x 10 solid
    molds                    10  2' x 2.5' x 3/4" cdx plywood

Decking/Tholepins
-----------------
    decking
        fore                2 3/4" plywood, 2-6 x 4-6 (30"x54")
        aft                    1 3/4" plywood, 4-9 x 2-0 (57"x24")
*1        sides                40'x4" curved to fit 3/4" plywood
    coamings            solid or maybe plywood with edge molding
*2        fore/aft            2  5'x8"x3/4
*2        sides                42' x 1 x 5
    tholepin mounts            4' x 3 x 3 solid

Thwarts/Benches
---------------
*3    solid                    42' 2x10 solid
*3    bracing                    60' 2x2 solid

Lee Boards
----------
*4    board                    2  52" x 16" x 6/4" (2 plys thick)
*5    mount                    2  3"x4"x16" white oak for strength
    hardware                2  T-bolt, straps, etc
    tackle                    2  blocks, line, cleat, 7x7 wire and nico-press
*5    chine rub board            2  2x4x6'

Rudder
------
*6    blade                    48" x 10 x 3/4
    cheeks                    2  36" x 10 x 3/4
    pivot bolt                3" x 3/8" + washers + self locking nut
    tiller                    6' x 2 x 6
    gudgeons and pintles    skeg pintle, transom pintle, 2 9/4" gudgeons.
*6    lifting hardware

Hatches
-------
    fore/aft                2  2' x 5' 3/4 ply

Fastenings/Glue/Glass
---------------------
*7                            how much???

Other hardware
--------------
*8                            what???


More Study
==========
*'d items have the following questios...

1.    decking sides cut lines will be taken off the finished hull. But we need an
    estimate of the plywood.
   
2.    Fore/aft and side coamings -- need to verify dimensions

3. Thwarts/Benches -- need detail design for the bracing

4. Lee boards -- are these dimensions satisfactory.

5. mount and chine rub boards -- need a detailed design.

6. rudder blade -- is 3/4 inch ok. Detailed design needed for lifting hardware.

7. how much fabric, glue, fastenings?

8. What other hardware??


Back to: Building a new Garvey

Copyright © Navesink Maritime Heritage Association

Navesink Maritime Heritage Association is a 501(c)(3) nonprofit organization dedicated to engaging Eastern Monmouth County with maritime and water related historical, skill building, environmental, and recreational activities, and encouraging responsible use of the Navesink estuary through its Discover, Engage, and Sustain approach

Powered by Wild Apricot Membership Software